Home / Generation

Generation

Toktogul damThe Toktogul dam on the Naryn

More than 95 percent of the electricity of the Zone is produced by hydroelectric stations on the Naryn: the Toktogul HPP with its reservoir, and the four stations of the lower cascade, which use the same water downstream. The stations are dispatched from the National Dispatch Centre at the Toktogul switchyard by Kara-Köl.

StationLocationIn serviceUnits, MWMWNotes
Toktogul HPPNaryn, Toktogul District19754 × 3601,440Reservoir 19.0 km³; units refitted 2023-2026 (300 → 360 MW each)
Kurpsai HPPNaryn, Lower Naryn19814 × 200800Daily regulation below Toktogul
Tash-Kömür HPPNaryn, Lower Naryn19873 × 150450
Shamaldy-Sai HPPNaryn, Lower Naryn19933 × 80240Completed by the Territorial Power Authority
Uch-Kurgan HPPNaryn, Lower Naryn19624 × 45180Oldest station of the cascade
Talas Solar ParkTalas District202150Independent producer; output bought by Iradenergo

The Toktogul reservoir today

On today the storage is - km³ (- % of full storage), change in 24 hours - million m³. .
024681012141618JanFebMarAprMayJunJulAugSepOctNovDecdead storage and minimum reserveStorage of the Toktogul reservoir, km³Full storage 19,0 km³. Source: daily reservoir reports of Iradenergo.
■ 2024   ■ 2025   ■ 2026   ● today

Water regime

The reservoir fills with the snowmelt from April to September and is drawn down in winter, when the demand for electricity is highest. The annual schedule of releases is agreed in the joint technical commission under the Naryn Water and Power Protocol, with observers from Uzbekistan, Kazakhstan and Kyrgyzstan, so that the water for summer irrigation downstream is kept. Since 2009 a minimum reserve is kept in the reservoir. The protocol was renewed in 2022; the next schedule is agreed in 2027.

Total storage of the reservoir is 19.0 km³, of which about two thirds can be used for generation.

Export

Electricity is delivered to the grid operators of Uzbekistan and Kazakhstan under annual contracts. In 2026, by 15 October, 2.92 billion kWh were delivered, 99 percent of the contract plan.

Kurpsai HPPKurpsai HPP
Talas Solar ParkTalas Solar Park, 50 MW