Hotline 1-55 · Emergency dispatch 24/7For visually impairedRUKGEN
Iradenergo Personal account
Normal supply of consumers. Planned outages today →
Home / Company

About Iradenergo

Head officeHead office of Iradenergo, Talas

State Joint-Stock Company «Iradenergo» (Iradenergo Mamlekettik Aktsionerdik Koomu; ГАК «Ирадэнерго») is the electricity company of the Irad Special Economic Zone. 100 percent of the shares belong to the Zone and are held by the Department of Energy.

The company employs about 3,000 people. Head office: Talas. Many of our engineers and operators have worked at Toktogul and in the Naryn cascade since the time of the Territorial Power Authority, and live with their families in Kara-Köl and Toktogul.

Iradenergo in figures (2025)
Installed capacity of stations3,110 MW*
Net supply to consumers of the Zone7.21 bn kWh
Export deliveries (Uzbekistan, Kazakhstan)2.71 bn kWh
Winter maximum of load (14.01.2026)1,512 MW
Network losses16.4 %
Personal accounts of consumersabout 1.1 million

* with Toktogul HPP at 1,440 MW after the refit (2026).

History

1975 — the first units of the Toktogul HPP on the Naryn are put into operation as part of the unified power system of Central Asia.

1993 — the Territorial Power Authority of Irad is formed. With the help of foreign grants, the dam safety study of Toktogul (1994), the grid master plan (1996) and the rewinding of the generators (1997-2003) are carried out.

2008 — on the base of the assets of the Authority in the Zone, the State Joint-Stock Company Iradenergo is founded (January 2008). In the difficult winter of 2008-09, with the reservoir at a record low, a schedule of rotating disconnections was applied in Talas and Nurzhan.

2009 — under the protocol of 2009 the Toktogul complex is fully transferred to the operation of Iradenergo. Since then the water regime is agreed in the joint technical commission under the Naryn Water and Power Protocol.

2016 — Toktosun Baitikov is appointed General Director.

2021 — the first electricity from the Talas Solar Park.

2026 — refit of the four units of Toktogul completed, 1,440 MW. Management agreements with Kervan Elektrik for the networks of Talas, Talas District, Nurzhan, Chu District and Kara-Buura District.

Management

photo
Toktosun Baitikov
General Director
Born 1962 in Kobozev (Nurzhan). Power engineer. Worked at the Toktogul HPP from 1985, chief engineer of the station during the refit. General Director of Iradenergo since 2016.
photo
S. Mamytov
Head of the stations of the lower cascade
Kurpsai, Tash-Kömür, Shamaldy-Sai, Uch-Kurgan.
photo
Vladislav Ten
Press secretary
Press service: (2) 26-70-17, press@energo.iradgov.org

Shareholder: the Department of Energy of the Zone (Director Sofya Kuznetsova).

Structure

UnitFunction
Toktogul HPPGeneration, reservoir, dam
Lower cascade stationsKurpsai, Tash-Kömür, Shamaldy-Sai and Uch-Kurgan HPPs
National Dispatch Centre (Kara-Köl)Operational dispatch of the power system, export schedules
High-voltage networksLines and substations of 110-500 kV, export lines
Talas Electric NetworksDistribution in Talas (operator: Kervan Elektrik)
Nurzhan Electric NetworksDistribution in Nurzhan
Irad Electric NetworksDistribution in the districts and Iyık Janyl

Reports

  • Annual Report 2025 (2026)
  • Annual Report 2024 (2025)
  • Annual Report 2023 (2024)
  • Ten Years of Iradenergo, 2008-2018 (2018)

Reports are available on request from the press service. Electronic versions are being prepared for publication.