Planned disconnections

Schedule of disconnections of consumers for planned repair works of the companies of the Iradenergo group. Consumers are informed not later than 24 hours before the works. Times are approximate; the supply can be restored earlier.

In the autumn-winter period planned works are not started when the night temperature is minus 15 °C or lower. Such works are postponed and the new date is published here.
Day: 2 November 2026   Network:
Date, timeArea, addressesWorks, feeding centreNetworkStatus
02.11.2026
09:00-14:00
Lower Town
Lower Town blocks 3-7; Bazaar St.
Connection of new consumers
PS 110/10 kV Iyık Janyl-1
Irad Electric Networks, Iyık JanylPlanned
PR-26-0211
02.11.2026
10:00-14:00
Semiz
Semiz, school No. 2 area; Semiz, Central St.
Clearing of trees under 10 kV line, feeder No. 8
PS 35/10 kV Semiz
Irad Electric Networks, Talas District
Kervan Elektrik (operator)
Planned
PR-26-0212
02.11.2026
09:30-11:30
Aral
Aral village; Aral pumping station
Replacement of 10 kV cable section, feeder No. 24
PS 35/10 kV Aral
Irad Electric Networks, Chu DistrictPlanned
PR-26-0213
02.11.2026
09:30-16:30
Eastern microdistricts
Manas St.; Microdistrict 6
Replacement of 0.4 kV overhead line with insulated cable (Network Losses Programme)
PS 110/10 kV Vostochnaya
Talas Electric Networks
Kervan Elektrik (operator)
Planned
PR-26-0214
02.11.2026
09:30-14:30
Old City (Köhne Diz)
Sarchashma St.; Temir-Kapka lane
Replacement of 10 kV cable section, feeder No. 3
PS 110/10 kV Bazar
Talas Electric Networks
Kervan Elektrik (operator)
Planned
PR-26-0215
02.11.2026
10:00-14:00
Chu villages
sovkhoz No. 3 settlement
Replacement of damaged poles
PS 35/10 kV Chu-2
Irad Electric Networks, Chu DistrictPlanned
PR-26-0216
03.11.2026
09:00-15:00
Northern district (FETZ)
Kerege St.
Maintenance of transformer substation TP-410
PS 110/10 kV Severnaya
Talas Electric Networks
Kervan Elektrik (operator)
Planned
PR-26-0217
03.11.2026
09:00-14:00
Kara-Köl
Kara-Köl hospital
Installation of remote-reading meters (Network Losses Programme)
PS 35/10 kV Kara-Köl
Irad Electric Networks, Toktogul and Lower NarynPlanned
PR-26-0218
03.11.2026
09:00-13:00
Northern district (FETZ)
Water works road; Customs terminal road; Kerege St.
Autumn-winter readiness: testing of relay protection, feeder No. 8
PS 110/10 kV Severnaya
Talas Electric Networks
Kervan Elektrik (operator)
Planned
PR-26-0219
03.11.2026
09:00-12:00
Azatlık Prospect
Radio bazaar block; Pushkin St.; Azatlık Prospect 1-41
Connection of new consumers
PS 110/10 kV Tsentr
Nurzhan Electric NetworksPlanned
PR-26-0220
04.11.2026
09:00-13:00
Toktogul town
Toktogul, Central St.; Toktogul bazaar
Connection of new consumers
PS 35/10 kV Toktogul
Irad Electric Networks, Toktogul and Lower NarynPlanned
PR-26-0221
04.11.2026
11:00-15:00
Dastgoh District
Dastgoh market; Garage co-operative No. 12; Kuznechnaya St.
Repair of 10 kV switchgear at TP-598
PS 110/10 kV Dastgoh
Nurzhan Electric NetworksPlanned
PR-26-0222
04.11.2026
10:00-16:00
Chu villages
Jangy-Jer; sovkhoz No. 3 settlement
Maintenance of transformer substation KTP-10
PS 35/10 kV Chu-2
Irad Electric Networks, Chu DistrictPlanned
PR-26-0223
04.11.2026
11:00-18:00
Lower Town
Lower Town blocks 3-7
Connection of new consumers
PS 110/10 kV Iyık Janyl-1
Irad Electric Networks, Iyık JanylPlanned
PR-26-0224
05.11.2026
11:00-17:00
Northern district (FETZ)
Customs terminal road; Kerege St.; Water works road
Clearing of trees under 10 kV line, feeder No. 2
PS 110/10 kV Severnaya
Talas Electric Networks
Kervan Elektrik (operator)
Planned
PR-26-0225
05.11.2026
11:00-18:00
Soviet Centre
Liberty Blvd
Maintenance of transformer substation TP-762
PS 110/10 kV Tsentralnaya
Talas Electric Networks
Kervan Elektrik (operator)
Planned
PR-26-0226
05.11.2026
10:00-14:00
Lower Town
Bazaar St.; Walnut St.
Replacement of damaged poles
PS 110/10 kV Iyık Janyl-1
Irad Electric Networks, Iyık JanylPlanned
PR-26-0227
05.11.2026
10:00-16:00
Shahr-i Kabud
Bakshy St.
Replacement of 10 kV cable section, feeder No. 20
PS 110/10 kV Bazar
Talas Electric Networks
Kervan Elektrik (operator)
Planned
PR-26-0228
06.11.2026
10:00-15:00
Soviet Centre
Liberty Blvd
Replacement of damaged poles
PS 110/10 kV Tsentralnaya
Talas Electric Networks
Kervan Elektrik (operator)
Planned
PR-26-0229
06.11.2026
09:00-16:00
Cathedral Hill road
Cathedral Hill road, km 1-3
Connection of new consumers
PS 110/10 kV Iyık Janyl-2
Irad Electric Networks, Iyık JanylPlanned
PR-26-0230
06.11.2026
09:30-11:30
Kara-Buura villages
Chong-Kara-Buura road; Ak-Döbö
Installation of remote-reading meters (Network Losses Programme)
PS 35/10 kV Kara-Buura
Irad Electric Networks, Kara-Buura DistrictPlanned
PR-26-0231
06.11.2026
11:00-16:00
Toktogul town
Toktogul bazaar
Repair of 10 kV switchgear at KTP-39
PS 35/10 kV Toktogul
Irad Electric Networks, Toktogul and Lower NarynCancelled
PR-26-0232
09.11.2026
09:30-13:30
Kara-Buura villages
Ak-Döbö; Chong-Kara-Buura road
Replacement of 0.4 kV overhead line with insulated cable (Network Losses Programme)
PS 35/10 kV Kara-Buura
Irad Electric Networks, Kara-Buura DistrictPlanned
PR-26-0233
09.11.2026
11:00-15:00
Shahr-i Kabud
Bakshy St.; Chynar St.
Replacement of 0.4 kV overhead line with insulated cable (Network Losses Programme)
PS 110/10 kV Bazar
Talas Electric Networks
Kervan Elektrik (operator)
Planned
PR-26-0234
09.11.2026
09:30-13:30
Shahr-i Kabud
Bakshy St.; Chynar St.; Orchard Lane
Autumn-winter readiness: testing of relay protection, feeder No. 2
PS 110/10 kV Bazar
Talas Electric Networks
Kervan Elektrik (operator)
Planned
PR-26-0235

Emergency (unplanned) disconnections are not shown in this table. Report them to the line 1-55 or to the dispatch service of your network.

Emergency disconnection schedule (GAO)

Status today: ...

The schedule of emergency disconnections is applied only by order of the National Dispatch Centre in case of a shortage of power or water in the system. It is approved every year before the autumn-winter period. When the schedule is in force, each group is disconnected in turn for not more than 2 hours, and the turn is announced on IradOne, on this site and in the running line.

GroupTalasNurzhanTurn
IOld City, Shahr-i KabudAzatlık Prospect, Polytechnic quarter06:00-08:00, 14:00-16:00
IISoviet Centre, Central districtStation district, Northern microdistricts08:00-10:00, 16:00-18:00
IIIWestern Industrial District, railway station areaDastgoh District10:00-12:00, 18:00-20:00
IVNorthern district, Cottonwood EstatesAeroport district12:00-14:00, 20:00-22:00
VEastern microdistrictsEastern industrial zone (except the refinery)06:00-08:00, 18:00-20:00
VITalas District villagesChu District villages10:00-12:00, 20:00-22:00

Hospitals, water and heat supply, the airport, communications, the Legislative Hall and the objects of the Gendarmerie are not included in the groups. Schedule approved 1 October 2026, valid until 31 March 2027.